Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/mmmedical.ubuntu.staging.creo.dev/httpdocs/wp-includes/functions.php on line 6131
Peterborough Hospital - MM Medical
Skip to content

M&M Medical forged a successful partnership with Mercury Engineering of Dublin & Brookfield to ensure this project was completed on time. The development includes 612 In-patient beds, an emergency care centre, general and specialist outpatient services, day surgery, elective and emergency surgery, diagnostics, cancer and therapy services as well as a women and children’s hospital, and a multi-disciplinary education and training centre.

The project value to M&M Medical was in excess of £2.25 million and consisted of some of the following:

• 3200 number Terminal Units
• 79 number AVSU Modules
• 2 number Air Plants
• 2 number Vacuum Plants
• 1 number 2×10 Nitrous Oxide Auto Manifold c/w E.S.M
• 1 number 2×10 O2/N2O Auto Manifold c/w E.S.M
• 1 number 2×10 Medical Air 4 Auto Manifold c/w E.S.M
• 2 number 2×10 Surgical Air 7 Auto Manifolds (Back Up to Plants)
• 8 number Duplex AGSS Plants
• 11 number Plant Alarms